Follow my blog with Bloglovin
I am sadly behind in my yopping update and I thought I was only a couple of weeks behind and not a whole month! I am here now so let's get updating. I think this is the update for the 23rd week.
I finished the last four advent gnomes just in time for December 1st. My granddaughter is enjoying playing with them as we count down to Christmas. Four down - Twenty to go.
and here they all are ready for their day by day reveal:
including Saint Gnicholas
November 25th was International Gansey Day and our intrepid leader put together a collage of many of the ganseys we have knit for the
Cordova Gansey Project.
|
can you find me? |
I have been knitting socks - but they are all testknits for next season's SuperSock World Challenge so no pictures to show. Two done - ten to go (I am knitting shorty singles just to make sure I understand all the patterns since I will be a moderator once the race begins).
There has also been a blanket, 2 pillows and a bed knit for my granddaughter's dollies.
|
side one of doubleknit pillow |
|
side two (what was I thinking) |
BirdSong and I are still trying to get along. I do love this pattern, but it hasn't been easy. I mistakenly did the bottom rib of the sweater in two colours because I didn't read the instructions correctly and I a) didn't like the stiff feeling of the ribbing, or b) how it lay against my hips, so yesterday I frogged all three inches and picked up 280 stitches and started the ribbing again with just the main colour. I am much happier now, but that has set me back a few more days. I have the decreasing done on the first sleeve, and need about 3 more inches for doing the cuff - which is supposed to be the two colour ribbing.
Note to self - read the instructions carefully and don't blunder on thinking you know what's going on.
I hope to be done by Christmas - maybe sooner if no more hiccups arise.
I am knitting myself another Gnome. I didn't joing the KAL this month but decided to make another
Oh Gnome you Didn't for myself as I have given the other two away. By next week I will probably have her done and can show her off.
I do have plans for a gansey throw - I have the pattern and the wool - and when Birdsong gets too much I will start on the squares. The square patterns were posted on the
The Lowestoft Gansey Project on facebook.
I will be here with my daughter for another six weeks or so before heading home. I have to leave because my visitor visa is only good for three months out of six. I hope to return in May once I am eligible to come back into the country. I have permission from the Police Department here to overstay a wee bit, because flights are soooooo expensive in December. At this point it looks like I can get home for a more reasonable price in mid-January. It is challenging dealing with red tape in a foreign country but so far it is going okay.
I have been swimming everyday for 15 minutes as long as there are no thunderstorm warnings (which there are yesterday and today). The sea is about 14C but I am layering up my bathing suits, and I have my neoprene gloves and silicone cap which makes it quite doable.
My dh has joined us now so we are both on the same timezone. Makes chatting much easier!
I will try to not let another month go by before posting my next update - I really don't know where the time goes!
If you want to follow other Yoppers their updates are on the top righthand side of my blog. I am sure anyone that crafts for Christmas is racing the clock to get their projects done before the 25th. If that is you - I wish you smooth crafting and no frogging. (That goes double for me!)